No Stakes. No Stringlines. No Problem.

Trimble Groundworks 3D machine control system improves efficiency and reduces downtime with stakeless navigation, monitoring productivity and quality, and managing design data from office to field.

Download the brochure

Trimble Groundworks Machine Control System

Advanced Trimble positioning technology helps increase the safety, accuracy and efficiency of drilling and piling operations. Integrated solutions bring the office and the field together for less rework, more productivity, and best of all ― more profitability.

Watch the video

IEA reports on their use of the technology on their Vermeer PD10 pile driver

This machinery communicates directly with the Trimble Groundworks system to not only locate the exact location of the pile, but also ensures accurate plumbness, alignment and proper depth. This is a notable improvement over the traditional method of using string lines to align the posts, which had a higher risk of error, longer set up time and added trip hazards. Since depth is managed using GPS, the site no longer has to worry about ensuring the entire site is to grade, which is a large cost saving to the company, as well as our clients. Traditionally, driving each pile would take approximately 90 seconds. With the new machinery, the team now can save up to 30 seconds on each pile.

Watch the video

Real-World Results in the Solar Farm Industry

Real-world results. Today’s solar farm jobs call for a competitive edge to achieve the speed, productivity, and accuracy necessary to compete and turn a profit.

Read what other contactors and industry analysts are saying about the solar farm industry

Download Solar Farm eBook

 

 

Contact Us

Solar Farm Piling Contact Form